[1] Gupta, J. N. D. (1988). Two-stage, hybrid flowshop scheduling problem. Journal of the operational research society, 39(4), 359–364.
[2] Reiter, S. (1966). A system for managing job-shop production. The journal of business, 39(3), 371–393.
[3] Truscott, W. G. (1986). Production scheduling with capacity-constrained transportation activities. Journal of operations management, 6(3–4), 333–348.
[4] Pan, Q.-K., & Ruiz, R. (2012). An estimation of distribution algorithm for lot-streaming flow shop problems with setup times. Omega, 40(2), 166–180.
[5] Feldmann, M., & Biskup, D. (2008). Lot streaming in a multiple product permutation flow shop with intermingling. International journal of production research, 46(1), 197–216.
[6] Marimuthu, S., Ponnambalam, S. G., & Jawahar, N. (2008). Evolutionary algorithms for scheduling m-machine flow shop with lot streaming. Robotics and computer-integrated manufacturing, 24(1), 125–139.
[7] Martin, C. H. (2009). A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming. Omega, 37(1), 126–137.
[8] Tseng, C.-T., & Liao, C.-J. (2008). A discrete particle swarm optimization for lot-streaming flowshop scheduling problem. European journal of operational research, 191(2), 360–373.
[9] Ulungu, E. L., Teghem, J., Fortemps, P. H., & Tuyttens, D. (1999). MOSA method: a tool for solving multiobjective combinatorial optimization problems. Journal of multicriteria decision analysis, 8(4), 221.
[10] Fatemi Qomi, M. T., Zandieh, M., & Moatarasini, S. M. (1384). Hybrid flow shop scheduling problem with sequence-dependent setup time [Thesis]. https://doi.org/10.1016/j.apm.2013.10.061.
[11] Fattahi, P., & Daneshamooz, F. (2016). A model for job shop scheduling with lot streaming and a parallel assembly stage. Journal of operational research in its applications, 13(3), 53–73.
[12] Lalitha, J. L., Mohan, N., & Pillai, V. M. (2017). Lot streaming in [N-1](1)+ N (m) hybrid flow shop. Journal of manufacturing systems, 44, 12–21.
[13] Chen, T.-L., Cheng, C.-Y., & Chou, Y.-H. (2020). Multi-objective genetic algorithm for energy-efficient hybrid flow shop scheduling with lot streaming. Annals of operations research, 290, 813–836.
[14] Bagheri, M., Babaei Meybodi, N., & Enzebati, A. H. (2018). Modeling and optimizing a multi-objective flow shop scheduling problem to minimize energy consumption, completion time and tardiness. Journal of decisions and operations research, 3(3), 204–222. DOI:10.22105/dmor.2018.81214
[15] Wang, S., Kurz, M., Mason, S. J., & Rashidi, E. (2019). Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups. International journal of production research, 57(22), 6893–6907.
[16] Wang, S., Wang, X., & Yu, L. (2020). Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times. International journal of systems science: operations & logistics, 7(3), 291–307.
[17] Han, Y., Li, J., Liu, Y., Zheng, Z., Pan, Y., Sang, H., & Liu, L. (2019). Migrating birds optimization for lot-streaming flow shop scheduling problem [presentation]. 2019 ieee congress on evolutionary computation (cec) (pp. 667–672).
[18] He, X., Dong, S., & Zhao, N. (2019). Research on rush order insertion rescheduling problem under hybrid flow shop based on NSGA-III. International journal of production research, 58, 1–17. DOI:10.1080/00207543.2019.1613581
[19] Liu, S., Pei, J., Cheng, H., Liu, X., & Pardalos, P. M. (2019). Two-stage hybrid flow shop scheduling on parallel batching machines considering a job-dependent deteriorating effect and non-identical job sizes. Applied soft computing, 84, 105701. https://doi.org/10.1016/j.asoc.2019.105701
[20] Marichelvam, M. K., Geetha, M., & Tosun, Ö. (2020). An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors--A case study. Computers & operations research, 114, 104812. https://doi.org/10.1016/j.cor.2019.104812
[21] Li, Y., Li, X., Gao, L., Zhang, B., Pan, Q.-K., Tasgetiren, M. F., & Meng, L. (2021). A discrete artificial bee colony algorithm for distributed hybrid flowshop scheduling problem with sequence-dependent setup times. International journal of production research, 59(13), 3880–3899.
[22] Cai, J., Zhou, R., & Lei, D. (2020). Fuzzy distributed two-stage hybrid flow shop scheduling problem with setup time: collaborative variable search. Journal of intelligent & fuzzy systems, 38(3), 3189–3199.
[23] Li, J. qing, Tao, X. rui, Jia, B. xian, Han, Y. yan, Liu, C., Duan, P., … Sang, H. yan. (2020). Efficient multi-objective algorithm for the lot-streaming hybrid flowshop with variable sub-lots. Swarm and evolutionary computation, 52, 100600. DOI:10.1016/j.swevo.2019.100600
[24] Wang, P., Sang, H., Tao, Q., Guo, H., Li, J., Gao, K., & Han, Y. (2020). Improved migrating birds optimization algorithm to solve hybrid flowshop scheduling problem with lot-streaming. IEEE access, 8, 89782–89792.
[25] Shao, W., Shao, Z., & Pi, D. (2021). Multi-objective evolutionary algorithm based on multiple neighborhoods local search for multi-objective distributed hybrid flow shop scheduling problem. Expert systems with applications, 183, 115453. DOI:10.1016/j.eswa.2021.115453
[26] Dabiri, M., Yazdani, M., Naderi, B., & Haleh, H. (2022). Modeling and solution methods for hybrid flow shop scheduling problem with job rejection. Operational research, 22(3), 2721–2765. DOI:10.1007/s12351-021-00629-2
[27] Madenoğlu, F. (2021). Solving optimization problem with particle swarm optimization: solving hybrid flow shop scheduling problem with particle swarm optimization algorithm. In Applying particle swarm optimization: new solutions and cases for optimized portfolios (pp. 263–277). Cham: Springer International Publishing. DOI: 10.1007/978-3-030-70281-6_14
[28] Amirteimoori, A., Kia, R., & Tavakkoli-Moghaddam, R. (2021). Hybrid flow shop with limited transportation scheduling problem: a comparison between genetics algorithm, and a novel recursive local search heuristic. Research Square. DOI: 10.21203/rs.3.rs-687470/v1
[29] Engin, O., & İşler, M. (2022). An efficient parallel greedy algorithm for fuzzy hybrid flow shop scheduling with setup time and lot size: a case study in apparel process. Journal of fuzzy extension and applications, 3(3), 249–262.
[30] Zanjani, B., Amiri, M., Hanafizadeh, P., & Salahi, M. (2021). Robust multi-objective hybrid flow shop scheduling. Journal of applied research on industrial engineering, 8(1), 40–55.
[31] Zhang, B., Pan, Q., Gao, L., Zhang, X., Sang, H., & Li, J. (2017). An effective modified migrating birds optimization for hybrid flowshop scheduling problem with lot streaming. Applied soft computing, 52, 14–27.
[32] Al Jadaan, O., Rao, C. R., & Rajamani, L. (2006). Parametric study to enhance genetic algorithm performance, using ranked based roulette wheel selection method [presentation]. International conference on multidisciplinary information sciences and technology (inscit2006) (Vol. 2, pp. 274–278).
[33] Deb, K. (2000). Multi-objective evolutionary optimization: past, present, and future. In Evolutionary design and manufacture: selected papers from acdm’00 (pp. 225–236). Springer.
[34] Zitzler, E., & Thiele, L. (1999). Multiobjective evolutionary algorithms: A comparative case study and the strength Pareto approach. IEEE transactions on evolutionary computation, 3(4), 257–271. DOI:10.1109/4235.797969
[35] Schott, J. R. (1995). Fault tolerant design using single and multicriteria genetic algorithm optimization. https://dspace.mit.edu/bitstream/handle/1721.1/11582/33945300-MIT.pdf?sequence=2%0Ahttp://oai.dtic
.mil/oai/oai?verb=getRecord&metadataPrefix=html&identifier=ADA296310
[36] Rahmati, S. H. A., Hajipour, V., & Niaki, S. T. A. (2013). A soft-computing Pareto-based meta-heuristic algorithm for a multi-objective multi-server facility location problem. Applied soft computing, 13(4), 1728–1740.