Arditi, D., Tokdemir, O. B., & Suh, K. (2001). Effect of learning on line-of-balance scheduling. International journal of project management, 19(5), 265-277.
Azizi, N., Zolfaghari, S., & Liang, M. (2010). Modeling job rotation in manufacturing systems: the study of employee's boredom and skill variations. International journal of production economics, 123(1), 69-85.
Battaïa, O., & Dolgui, A. (2013). A taxonomy of line balancing problems and their solutionapproaches. International journal of production economics, 142(2), 259-277.
Ben-Tal, A., & Nemirovski, A. (2000). Robust solutions of linear programming problems contaminated with uncertain data. Mathematical programming, 88(3), 411-424.
Boysen, N., Fliedner, M., & Scholl, A. (2008). Assembly line balancing: which model to use when?. International journal of production economics, 111(2), 509-528.
Chiang, W. C., Kouvelis, P., & Urban, T. L. (2007). Line balancing in a just-in-time production environment: balancing multiple U-lines. IIE transactions, 39(4), 347-359.
Cochran, E. B. (1973). The dynamics of work standards. Manufacturing engineering and management, 70(2), 28-31.
Fakhrzad, M., & Alinezhad, E. (2013). Advanced planning and scheduling with a learning effect in the flexible job shop manufacturing system.
Journal of industrial engineering research in production systems,
1(1), 13-24. (
In Persian).
https://ier.basu.ac.ir/article_493_en.html
Fattahi, P., Samouei, P., & Zandiyeh, M. (2017). A Multi-objective simulated annealing for simultaneous two-sided assembly line balancing and operators’ assignment.
Journal of production and operations management,
8(1), 1-20. (
In Persian). DOI:
10.22108/JPOM.2017.21543
Globerson, S., Levin, N., & Shtub, A. (1989). The impact of breaks on forgetting when performing a repetitive task. IIE transactions, 21(4), 376-381.
Hazır, Ö., & Dolgui, A. (2013). Assembly line balancing under uncertainty: robust optimization models and exact solution method. Computers & industrial engineering, 65(2), 261-267.
Hoedt, S., Claeys, A., Schamp, M., Van De Ginste, L., Aghezzaf, E. H., & Cottyn, J. (2019). The effect of job similarity on forgetting in multi-task production. Procedia manufacturing, 39, 983-990.
Hoedt, S., Claeys, A., Schamp, M., Van Landeghem, H., & Cottyn, J. (2018). Countering the forgetting effect in mixed-model manual assembly. IFAC-papersonline, 51(11), 856-861.
Hosseinzade, A., & Mottaghi, H. (2014). Production and operations management. Avae Shirin Publications. (In Persian).
Jaber, M. Y. (2016). The lot sizing problem and the learning curve: a review. Learning curves, 283-310.
Jaber, M. Y., & Guiffrida, A. L. (2004). Learning curves for processes generating defects requiring reworks. European journal of operational research, 159(3), 663-672.
Jafari Asl, A., Solimanpur, M., & Shankar, R. (2019). Multi-objective multi-model assembly line balancing problem: a quantitative study in engine manufacturing industry. OPSEARCH, 56(3), 603-627.
Kher, H. V., Malhotra, M. K., Philipoom, P. R., & Fry, T. D. (1999). Modeling simultaneous worker learning and forgetting in dual resource constrained systems. European journal of operational research, 115(1), 158-172.
Kumar, A., Pattanaik, L. N., & Agrawal, R. (2019). Optimal sequence planning for multi-model reconfigurable assembly systems. The international journal of advanced manufacturing technology, 100(5-8), 1719-1730.
Lolli, F., Balugani, E., Gamberini, R., & Rimini, B. (2017). Stochastic assembly line balancing with learning effects. IFAC-papersonline, 50(1), 5706-5711.
Monden, Y. (1994). Toyota production system. Springer US.
Musavi, F., Saremi, M., & Alibabaei, A. (2016). The effect of assembly line redesign based on engineering techniques on productivity and ergonomics factors.
Iran occupational health,
12(6), 1-15. (
In Persian).
http://ioh.iums.ac.ir/article-1-1508-en.html
Pereira, J., & Álvarez-Miranda, E. (2018). An exact approach for the robust assembly line balancing problem. Omega, 78, 85-98.
Salveson, M. E. (1955). The assembly line balancing problem. Journal of industrial engineering, 6, 62-69.
Samouei, P., & Ashayeri, J. (2019). Developing optimization & robust models for a mixed-model assembly line balancing problem with semi-automated operations. Applied mathematical modelling, 72, 259-275.
Thangavelu, S. R., & Shetty, C. M. (1971). Assembly line balancing by zero-one integer programming. AIIE transactions, 3(1), 61-68.
Thomopoulos, N. T. (2014). Assembly line planning and control. Springer International Publishing.
Wright, T. P. (1936). Factors affecting the cost of airplanes. Journal of the aeronautical sciences, 3(4), 122-128.
Xu, W., & Xiao, T. (2011). Strategic robust mixed model assembly line balancing based on scenario planning. Tsinghua science and technology, 16(3), 308-314.
Yeh, D. H., & Kao, H. H. (2009). A new bidirectional heuristic for the assembly line balancing problem. Computers & industrial engineering, 57(4), 1155-1160.
Yu, H., & Shi, W. (2013, July). A genetic algorithm for multi-model assembly line balancing problem. 2013 IEEE international symposium on assembly and manufacturing (ISAM) (pp. 369-371). IEEE.
Zhang, B., Xu, L., & Zhang, J. (2021). Balancing and sequencing problem of mixed-model U-shaped robotic assembly line: mathematical model and dragonfly algorithm based approach.
Applied soft computing,
98, 106739.
https://doi.org/10.1016/j.asoc.2020.106739