Abdulkader, M. M. S., ElBeheiry, M. M., Afia, N. H., & El-Kharbotly, A. K. (2013). Scheduling and sequencing in four machines robotic cell: application of genetic algorithm and enumeration techniques. Ain Shams engineering journal, 4(3), 465-474.
Azizoglu, M., Kondakci, S., & Köksalan, M. (2003). Single machine scheduling with maximum earliness and number tardy. Computers & industrial engineering, 45(2), 257-268.
Badrinathan, K. S., & Karunamoorthy, L. (2014). Reducing tool wear in CNC end milling operation using progressive feed rate. Applied mechanics and materials, 592, 716-723.
Batur, G. D., Karasan, O. E., & Akturk, M. S. (2012). Multiple part-type scheduling in flexible robotic cells. International journal of production economics, 135(2), 726-740.
Boothroyd, G., & Knight, W.A. (1989). Fundamentals of machining and machine tools. New York: Marcel Dekker.
Brintrup, A. M., Ramsden, J., & Tiwari, A. (2007). An interactive genetic algorithm-based framework for handling qualitative criteria in design optimization. Computers in industry, 58(3), 279-291.
Blazewicz, J., Sethi, S. P., & Sriskandarajah, C. (1989). Scheduling of robot moves and parts in a robotic cell (pp. 281-286). École des hautes études commerciales, Groupe d'études et de recherche en analyse des décisions.
Chaharsooghi, S. K., & Kermani, A. H. M. (2008). An effective ant colony optimization algorithm (ACO) for multi-objective resource allocation problem (MORAP). Applied mathematics and computation, 200(1), 167-177.
Che, A., Hu, H., Chabrol, M., & Gourgand, M. (2011). A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell. Computers & operations research, 38(9), 1275-1285.
Dawande, M. W., Geismar, H. N., Sethi, S. P., & Sriskandarajah, C. (2007). Throughput optimization in robotic cells (Vol. 101). Springer Science & Business Media.
Drobouchevitch, I. G., Sethi, S. P., & Sriskandarajah, C. (2006). Scheduling dual gripper robotic cell: one-unit cycles. European journal of operational research, 171(2), 598-631.
Elmi, A., & Topaloglu, S. (2017). Cyclic job shops robotic cell scheduling problem: ant colony optimization. Computers & industrial engineering, 111, 417-432.
Fathian, M., Kamalabadi, I. N., Heydari, M., Farughi, H., & Naseri, F. (2013). Applying metaheuristic algorithms for output rate analysis in two-machine robotic manufacturing cells.
International journal of advanced robotic systems,
10(3), 169.
https://doi.org/10.5772/56051
Foumani, M., Razeghi, A., & Smith-Miles, K. (2020). Stochastic optimization of two-machine flow shop robotic cells with controllable inspection times: from theory toward practice.
Robotics and computer-integrated manufacturing,
61, 101822.
https://doi.org/10.1016/j.rcim.2019.101822
Gultekin, H., Akturk, M. S., & Karasan, O. E. (2008). Bicriteria robotic cell scheduling. Journal of scheduling, 11(6), 457-473.
Gultekin, H., Akturk, M. S., & Karasan, O. E. (2010). Bicriteria robotic operation allocation in a flexible manufacturing cell. Computers & operations research, 37(4), 779-789.
Gultekin, H., Dalgıç, Ö. O., & Akturk, M. S. (2017). Pure cycles in two-machine dual-gripper robotic cells. Robotics and computer-integrated manufacturing, 48, 121-131.
Gultekin, H. (2012). Scheduling in flowshops with flexible operations: throughput optimization and benefits of flexibility. International journal of production economics, 140(2), 900-911.
Gürel, S., Gultekin, H., & Akhlaghi, V. E. (2019). Energy conscious scheduling of a material handling robot in a manufacturing cell. Robotics and computer-integrated manufacturing, 58, 97-108.
Hoogeveen, H. (2005). Multicriteria scheduling. European journal of operational research, 167(3), 592-623.
Hosseinzadeh, M., Mehrgan, M., Aghaei Meibodi, L., & Abbasian, E. (2018). Developing stochastic additive utility method (UTA) considering the possible dependency among criteria. Industrial management journal, 10(4), 503-524.
Kayan, R. K., & Akturk, M. S. (2005). A new bounding mechanism for the CNC machine scheduling problems with controllable processing times. European journal of operational research, 167(3), 624-643.
Kharbeche, M., Carlier, J., Haouari, M., & Moukrim, A. (2011). Exact methods for the robotic cell problem. Flexible services and manufacturing journal, 23(2), 242-261.
Khoran, M., & Safari, H. (2017). An investigation of effects of tool size and feed rate on tool life in high-speed milling of Ti-6Al-4V alloy. Modares mechanical engineering, 16(12), 21-26.
Khorasani, N., & Esmaelian, M. (2018). Integrating process planning and scheduling taking into account multiple objective using constraint planning. Industrial management journal, 10(4), 677-698.
Köksalan, M., & Keha, A. B. (2003). Using genetic algorithms for single-machine bicriteria scheduling problems. European journal of operational research, 145(3), 543-556.
Li, Y., Zhang, X., Ran, Y., & Zhang, G. (2021). Early failure modeling and analysis of CNC machine tools. The international journal of advanced manufacturing technology, 112(9), 2731-2754.
Majumder, A., Laha, D., & Suganthan, P. N. (2019). Bacterial foraging optimization algorithm in robotic cells with sequence-dependent setup times. Knowledge-based systems, 172, 104-122.
Moradi, V., Yousefi Nejad Attari, M., & Farughi, H. (2018). Modeling for minimizing cycle time in a three-machine robotic cell with assumption of tool switching.
Journal of industrial engineering research in production systems,
6(12), 1-17. (
In Persian). DOI:
10.22084/IER.2017.12669.1578
Ramalingam, S., & Watson, J. (1977). Tool-life distributions part 1: single-injur toollife model. Journal of engineering for industry, 99(3), 519-522.
Rezaeian, J., Derakhshan, N., Mahdavi, I., & Alizadeh Foroutan, R. (2021). Due date assignment and JIT scheduling problem in blocking hybrid flow shop robotic cells with multiple robots and batch delivery cost. International journal of industrial mathematics, 13(2), 145-162.
Sethi, S. P., Sriskandarajah, C., Sorger, G., Blazewicz, J., & Kubiak, W. (1992). Sequencing of parts and robot moves in a robotic cell. International journal of flexible manufacturing systems, 4(3), 331-358.
Tavakkoli-Moghaddam, R., Masoudi, S., & Eghbali, H. (2016). Solving a new mathematical model for a multi-objective and multi-depot vehicle routing problem by a non-dominated sorting Genetic algorithm. Journal of industrial engineering research in production systems, 3(6), 167-175.
Taylor, F. W. (1907). On the art of metal cutting. Trans. ASME, 28, 31-35.
Tonke, D., Grunow, M., & Akkerman, R. (2019). Robotic-cell scheduling with pick-up constraints and uncertain processing times. IISE transactions, 51(11), 1217-1235.
Yang, Z., Zhu, D., Chen, C., Tian, H., Guo, J., & Li, S. (2018). Reliability modelling of CNC machine tools based on the improved maximum likelihood estimation method.
Mathematical problems in engineering,
2018.
https://doi.org/10.1155/2018/4260508
Yildiz, S., Karasan, O. E., & Akturk, M. S. (2012). An analysis of cyclic scheduling problems in robot centered cells. Computers & operations research, 39(6), 1290-1299.
Zhang, X., Han, C., Luo, M., & Zhang, D. (2020). Tool wear monitoring for complex part milling based on deep learning.
Applied sciences,
10(19), 6916.
https://doi.org/10.3390/app10196916